GreenHouse

Client

Greenhouse

Date

December 20, 2025

Location

Peje

Project Duration

Greenhouse

Tonazha

720T

About Project

The production of the metal structure for the 10,000 m² factory — a 720-ton realization, completed within 140 days, demonstrating Eurometal’s capacity, precision and high quality for the Greenhouse project in Peja (2025).

Work Process

• Client & Project Requirements

In collaboration with the client Greenhouse, we analyze the requirements for 80 mm thick sandwich panels, determining the most suitable solution for the roof and facade of the factory.

• Technical Planning & Material Selection

Detailed design of the plan and selection of quality materials, guaranteeing optimal thermal and acoustic insulation, durability and full compatibility with the metal structure.

• Installation & Quality Execution

Professional installation of 80 mm thick sandwich panels, with a focus on precision, safety and compliance with the highest construction standards.

• Final Control & Handover

Final inspection of the works and delivery of the completed project, ensuring long-term functionality, modern aesthetics and maximum insulation for the factory roof and facade.