Agna Group

Client

Agna Group

Date

January 20, 2025

Location

Shkabaj, Prishtina

Project Duration

50 Days

Tonazha

250 T

About Project

EUROMETAL has successfully completed an industrial steel structure project for Agna Group in Shkabaj, Prishtina. The project included engineering design, fabrication, and erection of a high-performance steel structure suitable for demanding industrial operations. ● The structure consists of steel columns and beams connected with bolted joints and diagonal bracing, enabling large clear-span interior spaces without intermediate columns. This design provides maximum functionality, flexibility, and adaptability for various industrial uses. ● All load-bearing elements are protected with a 60-minute fire-resistant coating, ensuring enhanced safety, long-term durability, and resistance to atmospheric conditions. The clean and symmetrical design guarantees high structural stability and full compliance with modern industrial standards.

Work Process

• Client & Project Requirements

Close collaboration with Agna Group to analyze requirements and define optimal structural solutions.

• Technical Planning & Material Selection

Advanced engineering design and selection of high-quality materials to ensure safety and longevity.

• Fabrication & Erection

Precision fabrication and professional on-site installation.

• Final Inspection & Handover

Final inspection and project handover in accordance with industrial standards.

Related Projects