Agna Group

Client

Agna Group

Date

January 20, 2025

Location

Shkabaj, Prishtina

Project Duration

Agna Group

Tonazha

250 T

About Project

EUROMETAL has successfully completed an industrial steel structure project for Agna
Group in Shkabaj, Prishtina. The project included engineering design, fabrication, and
erection of a high-performance steel structure suitable for demanding industrial
operations.
● The structure consists of steel columns and beams connected with bolted joints and
diagonal bracing, enabling large clear-span interior spaces without intermediate
columns. This design provides maximum functionality, flexibility, and adaptability for
various industrial uses.
● All load-bearing elements are protected with a 60-minute fire-resistant coating, ensuring
enhanced safety, long-term durability, and resistance to atmospheric conditions. The
clean and symmetrical design guarantees high structural stability and full compliance
with modern industrial standards.

Work Process

• Client & Project Requirements

Close collaboration with Agna Group to analyze requirements and define optimal structural solutions.

• Technical Planning & Material Selection

Advanced engineering design and selection of high-quality materials to ensure safety and longevity.

• Fabrication & Erection

Precision fabrication and professional on-site installation.

• Final Inspection & Handover

Final inspection and project handover in accordance with industrial standards.

Related Projects