GAP

Client

GAP

Date

January 1, 2021

Location

Gjilan

Project Duration

30 Ditë

Tonazha

180T

About Project

A project completed to the highest construction standards

This project was completed using a premium-quality steel structure, designed and manufactured to ensure maximum durability, safety, and longevity.

The roof and façade system was built with galvanized Z and C profiles, providing high resistance to corrosion and excellent structural performance. The building is insulated with top-grade 100 mm sandwich panels, ensuring superior thermal and acoustic insulation, energy efficiency, and long-term protection against weather conditions.

The result is a modern, functional facility built according to the highest quality standards, meeting the highest requirements for performance and reliability.

Work Process

• Client & Project Requirements

In collaboration with the client GAP, we analyze the requirements for the installation of t=100mm sandwich panels for the roof and facade, determining the most suitable solution for covering the 4800 m² area.

• Technical Planning & Material Selection

Detailed design of the plan and selection of quality materials, guaranteeing optimal thermal insulation, durability and full compatibility with the metal structure.

• Installation & Quality Execution

Professional installation of t=100mm sandwich panels with a focus on precision, high quality and compliance with construction standards for large areas.

• Final Control & Handover

Final inspection of the works and delivery of the completed project, ensuring long-term functionality, modern aesthetics and maximum insulation for the roof and facade of the building.