BP HOME

Client

BP HOME

Date

February 1, 2020

Location

Prishtine

Project Duration

BP HOME

Tonazha

800T

About Project

Production of the metal structure according to the project — an 800-ton realization with an area of ​​40,000 m², completed within 200 days, demonstrating Eurometal’s capacity, precision and high quality for the BP HOME project in Pristina (2020)...

Work Process

• Client & Project Requirements

In collaboration with the client BP HOME, we analyze the requirements for 100 mm sandwich panels, determining the most suitable solution for the roof and facade of the building.

• Technical Planning & Material Selection

Detailed design of the plan and selection of quality materials, guaranteeing optimal thermal insulation, durability and compatibility with the existing metal structure.

• Installation & Quality Execution

Professional installation of 100 mm sandwich panels, focusing on precision, high quality and compliance with construction standards.

• Final Control & Handover

Final inspection of the works and delivery of the completed project, ensuring long-term functionality, modern aesthetics and maximum insulation.

Related Projects