Castrol Oil

Client

Castrol Oil

Date

February 1, 2020

Location

Prishtine

Project Duration

Castrol Oil

Tonazha

140T

About Project

Production of the metal structure according to the project — a 140-ton realization, completed within 55 days, which proves the technical capacity, efficiency and high precision of Eurometal for the Castrol project in Pristina.

Work Process

• Client & Project Requirements

Collaboration with the Castrol client to understand the specific needs and technical requirements for the metal structure, according to the approved project.

• Structural Engineering & Planning

Detailed design of the metal structure, focusing on durability, safety and compliance with contemporary construction standards.

• Production & Assembly

Production and assembly of the 140-ton metal structure by Eurometal, meeting the 55-day deadline and guaranteeing maximum quality and precision.

• Final Control & Delivery

Complete control of the completed structure and delivery of the completed project, ready for use and for further construction phases.