{"id":633,"date":"2025-12-30T21:06:29","date_gmt":"2025-12-30T21:06:29","guid":{"rendered":"https:\/\/eurometal-ks.com\/?post_type=projects&#038;p=633"},"modified":"2026-01-19T18:58:17","modified_gmt":"2026-01-19T18:58:17","slug":"castrol-oil","status":"publish","type":"projects","link":"https:\/\/eurometal-ks.com\/?projects=castrol-oil","title":{"rendered":"Castrol Oil"},"content":{"rendered":"<p>Production of the metal structure according to the project \u2014 a 140-ton realization, completed within 55 days, which proves the technical capacity, efficiency and high precision of Eurometal for the Castrol project in Pristina.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Production of the metal structure according to the project \u2014 a 140-ton realization, completed within 55 days, which proves the technical capacity, efficiency and high precision of Eurometal for the Castrol project in Pristina.<\/p>\n","protected":false},"featured_media":603,"template":"","meta":[],"class_list":["post-633","projects","type-projects","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/eurometal-ks.com\/index.php?rest_route=\/wp\/v2\/projects\/633","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eurometal-ks.com\/index.php?rest_route=\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/eurometal-ks.com\/index.php?rest_route=\/wp\/v2\/types\/projects"}],"version-history":[{"count":5,"href":"https:\/\/eurometal-ks.com\/index.php?rest_route=\/wp\/v2\/projects\/633\/revisions"}],"predecessor-version":[{"id":1608,"href":"https:\/\/eurometal-ks.com\/index.php?rest_route=\/wp\/v2\/projects\/633\/revisions\/1608"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eurometal-ks.com\/index.php?rest_route=\/wp\/v2\/media\/603"}],"wp:attachment":[{"href":"https:\/\/eurometal-ks.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=633"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}